Documenting Change Orders With AI Before They Become Arguments

5 min read Verified by the TradePrompt Field Team

The change order that turns into a fight is almost always the one that got verbally agreed on a Tuesday and written up on a Friday, in two sentences, with no reference to the original contract.

The fix is not more paperwork. It's the same paperwork produced fast enough that you actually do it before the work starts.

On this page
  1. Capture the delta, not the whole job
  2. The conversation script that comes with it

Capture the delta, not the whole job

A good change order describes precisely what changed relative to the signed scope, why it changed, who requested it, and what it does to price and schedule. Everything else is noise.

Take a photo of the condition, write two lines about what triggered it, and feed both facts to the prompt below with the original scope line item.

The conversation script that comes with it

The document doesn't sell the change order. The two-minute conversation does. Ask for a short script that leads with the condition, not the cost.